System Choice
One chemistry.
Configured by service demand.
The same four-component mortar is used for the initial scratch layer and the main body coat, while final thickness and texture are selected for the operating environment.
Selection Guide
Thickness follows exposure.
Confirm thermal cycling, drainage, cleaning temperature, chemical contact, slip risk and substrate condition before selecting the final build-up.
Food & beveragePrioritize hygiene, drainage and cleanability.
Hot-water washdownSpecify for actual temperature and frequency.
Wet productionSelect a slip profile suited to footwear and contamination.
Joints & drainsDetail terminations before installation begins.

